Iron Thumb

Ninety seconds in the seat of a 90-ton excavator. Hit the sweet spot through every phase of the dig cycle — DIG, SWING, DUMP, RETURN — to fill trucks fast and clean. Miss the zone and the cycle drags. Spill nothing. Fill everything.

TIME 90sTONS 0TRUCKS 0STREAK 0BEST 0
DIG
TRUCK LOAD0 / 100 t
The needle sweeps. Punch OPERATE (or SPACE) inside the green zone. Dead-center hits fill the bucket to the brim and build streak — streak shrinks the zone but multiplies tonnage. A miss dumps half a bucket on the ground and resets the streak. Fill 100-ton trucks. Most tons in 90 seconds wins. 900+ tons is journeyman. 1,300+ is Iron Thumb.