Reserves vs. Resources: Why the Seller's Number Is Too Big

QUARRY INTEL #8 · NOV 2026 · 2 MIN READ

Almost every quarry for sale comes with a big tonnage number. “80 million tons of reserves.” Almost every one of those numbers shrinks once a buyer's engineer works through it. Here is why, and how to estimate the real figure on the back of an envelope.

The ladder

In the US, public mining companies report under the SEC's S-K 1300 rules. Private sellers do not have to, but the vocabulary is the right one to use.

Category What it means Confidence
Inferred resource Rock that geology suggests is there, with few drill holes Low. Not enough to plan a mine on
Indicated resource Enough drilling and testing to estimate tonnage and quality with reasonable confidence Medium
Measured resource Close-spaced drilling and testing; tonnage and quality are well known High
Probable reserve Indicated (or measured) resource that is economic to mine under a real plan, with permits and costs considered Medium-high
Proven reserve Measured resource that is economic to mine under a real plan High

The key word is economic. A resource is rock in the ground. A reserve is rock you can permit, mine, process and sell at a profit.

Why the seller's number is too big

Sellers usually quote the whole volume of rock under the property, multiplied by a density. A buyer's engineer then takes out deductions like these:

Deduction Why Typical effect
Property-line setbacks Zoning and permits often require a buffer from boundaries, roads and homes Can remove a large ring of rock on small tracts
Final pit slopes Walls cannot be vertical; benches step back as the pit deepens Large on deep pits
Overburden and waste Soil and weathered rock on top, clay seams and bad layers inside Varies with geology
Quality cut-off Rock that fails spec (soundness, abrasion, deleterious material) is not saleable aggregate Can be large in variable deposits
Water and depth limits Pumping, sinkhole risk or permit limits on depth below the water table Can cap the pit floor
Plant and stockpile areas Space for the plant, roads, ponds and stockpiles is not mined Matters on small sites
Processing loss Fines and waste from crushing that cannot be sold Often 5–20% of mined rock, depending on product mix and fines market

None of these is exotic. Together they often cut a headline number by a third or more, and on a small, tight property they can cut it in half.

A quick check you can do

  1. Start with the tract area minus setbacks.
  2. Estimate the mineable thickness: rock bottom (or permit limit) minus overburden.
  3. Take about 70–85% of that box for slope losses, depending on depth and footprint.
  4. Multiply by density: crushed limestone in place is often around 2.4–2.6 t/m³ (about 2 short tons per cubic yard).
  5. Take off a processing loss.

If your number is far below the seller's, ask how theirs was made. The answer usually explains the gap.

What to ask for

The percentages above are rules of thumb. Every deposit is different. Have a qualified engineer or geologist review any reserve that a deal depends on.

Get Quarry Intel every week

New quarries, permits and ownership changes across the U.S., read from the federal registry and state notices. Free by email.

Working on a site or a deal?
ShotRock is an independent mining and aggregates consultancy: due diligence, reserves, permitting, quality and drone surveys.

RESERVE ESTIMATESTALK TO THE FIRM
SHARE: LINKEDINXEMAIL

Figures come from public sources (federal mine registry, USGS, state agencies) as of the issue date and are rounded. General information only, not legal, tax, investment or engineering advice for a specific site.