Reserves vs. Resources: Why the Seller's Number Is Too Big
Almost every quarry for sale comes with a big tonnage number. “80 million tons of reserves.” Almost every one of those numbers shrinks once a buyer's engineer works through it. Here is why, and how to estimate the real figure on the back of an envelope.
The ladder
In the US, public mining companies report under the SEC's S-K 1300 rules. Private sellers do not have to, but the vocabulary is the right one to use.
| Category | What it means | Confidence |
|---|---|---|
| Inferred resource | Rock that geology suggests is there, with few drill holes | Low. Not enough to plan a mine on |
| Indicated resource | Enough drilling and testing to estimate tonnage and quality with reasonable confidence | Medium |
| Measured resource | Close-spaced drilling and testing; tonnage and quality are well known | High |
| Probable reserve | Indicated (or measured) resource that is economic to mine under a real plan, with permits and costs considered | Medium-high |
| Proven reserve | Measured resource that is economic to mine under a real plan | High |
The key word is economic. A resource is rock in the ground. A reserve is rock you can permit, mine, process and sell at a profit.
Why the seller's number is too big
Sellers usually quote the whole volume of rock under the property, multiplied by a density. A buyer's engineer then takes out deductions like these:
| Deduction | Why | Typical effect |
|---|---|---|
| Property-line setbacks | Zoning and permits often require a buffer from boundaries, roads and homes | Can remove a large ring of rock on small tracts |
| Final pit slopes | Walls cannot be vertical; benches step back as the pit deepens | Large on deep pits |
| Overburden and waste | Soil and weathered rock on top, clay seams and bad layers inside | Varies with geology |
| Quality cut-off | Rock that fails spec (soundness, abrasion, deleterious material) is not saleable aggregate | Can be large in variable deposits |
| Water and depth limits | Pumping, sinkhole risk or permit limits on depth below the water table | Can cap the pit floor |
| Plant and stockpile areas | Space for the plant, roads, ponds and stockpiles is not mined | Matters on small sites |
| Processing loss | Fines and waste from crushing that cannot be sold | Often 5–20% of mined rock, depending on product mix and fines market |
None of these is exotic. Together they often cut a headline number by a third or more, and on a small, tight property they can cut it in half.
A quick check you can do
- Start with the tract area minus setbacks.
- Estimate the mineable thickness: rock bottom (or permit limit) minus overburden.
- Take about 70–85% of that box for slope losses, depending on depth and footprint.
- Multiply by density: crushed limestone in place is often around 2.4–2.6 t/m³ (about 2 short tons per cubic yard).
- Take off a processing loss.
If your number is far below the seller's, ask how theirs was made. The answer usually explains the gap.
What to ask for
- Drill-hole logs and lab test results, with locations
- The mine plan and permit boundaries
- The reclamation plan (it fixes final slopes and depth)
- Any reserve report, with its date, author and assumptions
The percentages above are rules of thumb. Every deposit is different. Have a qualified engineer or geologist review any reserve that a deal depends on.
Get Quarry Intel every week
New quarries, permits and ownership changes across the U.S., read from the federal registry and state notices. Free by email.
Working on a site or a deal?