Reserve & Resource Estimation
The reserve number drives the valuation, the mine plan, and the disclosure. It deserves better than a spreadsheet someone inherited. We build reserves from the drill hole up and defend every assumption in writing.
What this covers
Geologic modeling
Drill-hole databases validated, sections cut, surfaces built, and the deposit modeled at the level of confidence the data actually supports.
Reserve estimation
Classification, modifying factors, dilution, recovery, and cutoff logic applied to recognized code standards — documented so an auditor can follow it.
Reporting-code support
Technical report summaries and supporting workings for SEC S-K 1300 filings; JORC and NI 43-101 framework familiarity for cross-border assets.
Reserve audits & reviews
Second-opinion reviews of existing statements before they go to a lender, a buyer, or a filing.
Reconciliation
Model-to-mill and plan-to-actual reconciliation that tells you whether the model or the operation is lying.
Deliverables
- Reserve statement with full methodology documentation
- Cross-sections, plan maps, and tonnage-grade tables
- Technical report summary sections ready for counsel review
- Audit memo with findings ranked by materiality
When you need this
Annual reserve updates, pre-transaction verification, first-time S-K 1300 compliance, or when the numbers stopped reconciling and nobody can say why.
Who this is for
Operators
Quarries that need a defensible reserve life for planning, lenders, or a sale.
Public companies
Issuers that need reserve support for S-K 1300 disclosure, or a check of a qualified person's work.
Landowners and buyers
Anyone who needs to know how much saleable rock is really under a tract.
How an engagement runs
01Data audit
We check collar surveys, logs, core recovery, and lab data before any model is built. A model cannot fix bad data.
02Geologic model
We build the deposit model from sections or 3D, with lithology, overburden, and quality domains.
03Estimate
We estimate tonnage and quality using methods that fit the data density — from average end-area to block models.
04Mine design and modifying factors
We apply pit limits, setbacks, recovery, and permit boundaries to convert resources to reserves.
05Classification and report
We classify by confidence and write the report to the code you need: S-K 1300, JORC, NI 43-101, or an internal standard.
Sample reserve summary (illustrative)
| Category | Million short tons | Notes |
|---|---|---|
| Measured resource | 48.2 | Drill spacing at or under 400 ft |
| Indicated resource | 61.7 | Drill spacing 400–800 ft |
| Proven reserve | 38.9 | Measured, inside permitted pit, 92% recovery |
| Probable reserve | 44.1 | Indicated, inside pit design, setbacks applied |
Illustrative values only. They do not describe any client or site.
What we look for first
Data before models
Most reserve problems start with the data, not the method: collars that were never surveyed, core recovery that was not logged, or lab results that do not match the samples. We spend the first days of every job testing the data, because a precise model built on weak data gives a false sense of confidence.
Quality as well as tons
For aggregate, saleable reserves depend on rock quality as much as volume. Clay seams, chert, soft zones, and reactive rock reduce the tons that meet specification. We model quality domains so the reserve reflects what can be sold, not just what can be blasted.
Modifying factors in plain view
Every factor that converts a resource to a reserve — pit slope, setback, recovery, dilution, permit boundary — is listed with its source. A reviewer, lender, or buyer can change any one of them and see the effect.
Right method for the data
We match the method to the drilling. Sparse holes support sections and polygons; dense drilling supports block models. We do not dress up thin data with a complex model.
Typical situations
Composite examples that show the kind of problem we solve. They do not describe a specific client.
The lender wants a reserve life
A family quarry refinancing its plant was asked by the bank for a reserve life. The last estimate was a decade old and used a pit that no longer matched the property. We rebuilt the model from the existing drilling, applied the current setbacks and permit boundary, and gave the bank a reserve statement with every assumption listed.
Two estimates, two answers
A buyer had the seller's reserve number and an older consultant's number, far apart. We traced the gap to one cause: one estimate counted rock under a county road and a power-line easement. Once both were removed, the estimates agreed within a few percent.
Is there enough rock to bother?
A landowner with an approach from an operator wanted to know whether the tract held enough stone to matter. We used state maps, nearby quarry data, and a short drilling plan to frame a range before any lease talks.
How we price it
Fees depend on the amount of data, the deposit type, and the reporting code. A reserve check of an existing estimate is a fixed fee. A new model and report is scoped after we see the drilling.
Questions we get
What is the difference between a resource and a reserve?
A resource is rock with reasonable prospects for economic extraction. A reserve is the part of a measured or indicated resource that is economically mineable after you apply mine design, recovery, permits, and other modifying factors.
Do you need new drilling?
Not always. We first test whether the existing data supports the decision you need to make. If it does not, we design the cheapest drilling program that closes the gap.
Can you work with our existing software?
Yes. We work with common mine planning and GIS packages and deliver models in standard formats.
Can you act as a qualified person?
Ask us about the specific code and filing. We will tell you plainly whether we can sign or whether we should support your qualified person.
Free tools for this work
How to estimate reserves with cross-sections · How to read a drill log · Royalty estimator for landowners