Your Stockpile Numbers Are Probably Wrong
Ask a quarry manager how much #57 stone is in the yard, and you will get a number. Ask how it was measured, and the answer is often “production minus sales.” That number drifts every month. At year-end, the survey crew finds the gap — and the accountants write it off.
Why book inventory drifts
| Source of error | What happens |
|---|---|
| Belt scale calibration | A scale reading 2% high on 500,000 tons a year adds 10,000 phantom tons |
| Bulk density guess | Piles are measured in volume but sold in tons. A wrong density factor (loose vs. compacted, wet vs. dry) skews every conversion |
| Unrecorded movements | Rehandling, blending, plant feed, returned loads and in-house use rarely hit the books cleanly |
| Waste and fines | Material that settles in ponds or is used as fill disappears from the books without a ticket |
| Eyeball estimates | A visual estimate of a pile can miss by 10–20% (Propeller) |
None of these is large alone. Over a year, together, they can move inventory by thousands of tons.
What the gap costs
On a 50,000-ton pile valued at $6–7 a ton, a 10–20% miss is 5,000–10,000 tons, or roughly $30,000–$70,000 of inventory value on one pile. Most yards have a dozen piles. The cost shows up three ways:
- Write-downs at year-end that hit earnings in one quarter.
- Bad production plans: crushing a product you already have too much of, or running short of one you thought you had.
- Deal risk: in an acquisition, inventory is often part of the price. A buyer who does not measure it pays for rock that is not there.
How drone surveys fix it
A drone flies the yard in under an hour. Software turns the photos into a 3D surface and computes the volume of every pile. With good ground control, results land within a few percent of true volume — often 97–99%, per Propeller. The report comes back within a day.
| Visual estimate | Ground survey | Drone survey | |
|---|---|---|---|
| Time on site | Minutes | 1–2 days | Under 1 hour flight |
| Accuracy | ±10–20% | High | High, with ground control |
| Practical frequency | Any time | Quarterly or yearly (cost) | Monthly or more |
| Safety | Fine | Surveyor walks on piles | No one on the piles |
Monthly drone counts turn year-end surprises into small monthly corrections you can trace to a cause: a scale out of calibration, a density factor that is off, a product line losing fines.
Getting it right
- Use ground control or an RTK/PPK drone. Without it, absolute accuracy suffers.
- Measure the base. A pile on uneven ground needs a good base surface, ideally surveyed before the pile was built.
- Fix the density. Test each product's bulk density in the pile, not from a handbook.
- Fly at the same time each month and reconcile against scale tickets the same day.
- Keep the files. A record of every pile surface is useful in audits and disputes.
ShotRock offers monthly and one-time drone stockpile inventories, reviewed by a mining engineer. Ask for a quote.
Get Quarry Intel every week
New quarries, permits and ownership changes across the U.S., read from the federal registry and state notices. Free by email.
Working on a site or a deal?
ShotRock is an independent mining and aggregates consultancy: due diligence, reserves, permitting, quality and drone surveys.
Figures come from public sources (federal mine registry, USGS, state agencies) as of the issue date and are rounded. General information only, not legal, tax, investment or engineering advice for a specific site.