PE Mining & Mineral Processing
The Study Vault
Exam-style problems in the format that works: answer first, worked solution, the trap the exam sets, and one rule of thumb to carry into the room. Thirty-one free problems below, plus drills in the Sim Yard. Full 100-problem vault in production.
Practice in the Sim Yard
SIM YARDBlast Master
Burden, spacing, and powder factor under pressure — the blasting block.SIM YARDMass Balance Mayhem
Tune crushers and screens to land three products in spec — the two-product and circuit balance block.SIM YARDCrusher Rush
Primary crushing and oversize — comminution and plant flow.SIM YARDGrade Runner
10% downgrade, 100 tons, a fading retarder — grade, rolling resistance, and retarding.SIM YARDIron Thumb
Dig, swing, dump, return — loader cycle time and truck match.SIM YARDSpoil Boss
Every haul foot costs money — dump planning and stripping cost.SIM YARDLand Shark Tycoon
Drill, buy, and assemble a permit block — reserves, land, and economics.SIM YARDSuper Miner
Five-minute break between problem sets.
Burden, spacing, and powder factor under pressure — the blasting block.SIM YARDMass Balance Mayhem
Tune crushers and screens to land three products in spec — the two-product and circuit balance block.SIM YARDCrusher Rush
Primary crushing and oversize — comminution and plant flow.SIM YARDGrade Runner
10% downgrade, 100 tons, a fading retarder — grade, rolling resistance, and retarding.SIM YARDIron Thumb
Dig, swing, dump, return — loader cycle time and truck match.SIM YARDSpoil Boss
Every haul foot costs money — dump planning and stripping cost.SIM YARDLand Shark Tycoon
Drill, buy, and assemble a permit block — reserves, land, and economics.SIM YARDSuper Miner
Five-minute break between problem sets.
When you see ___, do this
Signal words in the stem point to the method. Find the chapter in your reference before you start the arithmetic.
| Signal words | Method | Formula | Where to look |
|---|---|---|---|
| “parallel airways”, “splits” | Split the flow, use one airway’s R | R_eq = R/N² (identical); 1/√R_eq = Σ1/√R | Ventilation chapter |
| “after-tax cash flow”, “depreciation” | Deduct D before tax, add back after | ATCF = (R − C)(1 − t) + tD | Economics chapter |
| “feed, concentrate, tailings grades” | Two-product formula | Y = (f − t)/(c − t); R = Y·c/f | Mineral processing chapter |
| “percent solids”, “pulp SG” | Weight vs volume — check which | Cw = Ss(Sp − 1)/[Sp(Ss − 1)] | Mineral processing chapter |
| “dose”, “TWA”, “dBA” | Dose first, then TWA | D = 100ΣC/T; TWA = 16.61 log(D/100) + 90 | MSHA / health chapter |
| “incidence rate”, “contractor” | Operator population only | IR = N × 200,000 / hours | Safety chapter |
| “rimpull”, “rolling resistance” | Uphill add, downhill subtract | RP = GVW × 20 × (G ± RR) | Haulage chapter |
| “break-even stripping ratio”, “royalty” | Subtract every per-ton cost first | BESR = (P − royalty − cost)/strip $/bcy | Surface mining chapter |
| “scaled distance”, “per delay” | Square the ratio | W = (D/Ds)² | Blasting chapter |
| “burden”, “SG of explosive” | Cube-root density term | B = 3.15 De (SGe/SGr)^⅓ | Blasting chapter |
| “average end area”, “sections” | Do not extend past the end sections unless told | V = L(A₁ + A₂)/2 | Reserves chapter |
| “short tons”, “tonnes” | Convert before you choose | 1 t = 1.1023 st | Conversion tables |
The trap atlas
The ten traps exam writers build distractors from. Every wrong answer choice above comes from one of these.
| Topic | Trap | Fix |
|---|---|---|
| Ventilation | Parallel resistance as R/N | Use R/N², or split the flow and check one branch |
| Economics | Depreciation added back but never deducted | Write taxable income as its own line |
| Processing | Recovery from grades alone | Compute mass yield first |
| Safety | Pooling contractor and operator data | Two populations, two rates |
| Safety | Averaging dBA values | Go through dose |
| Surface mining | Leaving royalty out of BESR; dividing by swell | Royalty is a per-ton cost; swell is a distractor |
| Reserves | Forgetting recovery or the short-ton conversion | Finish the unit chain before picking an answer |
| Haulage | Grade without rolling resistance; 60-min hour | Effective grade and a 50-min hour |
| Blasting | Bench height as the charge column | Column = H + J − T |
| Every topic | Stopping at part (a) | Two-part items give two answers — read the stem twice |
Study plan and reference strategy: How to pass the PE Mining exam. Field math: engineering calculators.