GIS, Land & Permitting
Every mine is a land deal wearing a hard hat. We map the parcels, the owners, the zoning, and the constraints before they become surprises with lawyers attached.
What this covers
Parcel & ownership mapping
County-record parcel fabric with owner names, acreages, and assemblage analysis — who you'd need to buy, and in what order.
Zoning & entitlement review
Current zoning, overlay districts, setback math, and the realistic path (and timeline) to a mining entitlement.
Site selection & screening
Multi-criteria screening across geology, transportation, market, and permitting risk — with the losers documented so nobody re-litigates them.
Haul-route & logistics studies
Route mapping, constraint analysis, and cartographic deliverables ready for permit hearings and board decks.
Permit technical support
Mapping, cross-sections, reserve exhibits, and technical narrative for mining, air, and environmental permit applications.
Deliverables
- KMZ and GIS packages that open on any machine
- Ownership and assemblage exhibits
- Entitlement path memo with timeline and risk register
- Hearing-ready cartography
When you need this
Before an option is signed. Before a rezoning is filed. When an expansion needs neighbors mapped and a strategy, not a guess.
Who this is for
Developers of new quarries
Teams that need a site found, screened, and permitted.
Operators expanding
Sites that need new acreage, a rezoning, or a permit amendment.
Landowners
Owners who want to know whether their land could be permitted before they negotiate a lease.
How an engagement runs
01Constraint map
We map parcels, ownership, zoning, wetlands, floodplain, schools, homes, and roads in GIS.
02Permit-path plan
We list every approval, its order, its agency, and its realistic duration.
03Exhibits
We build the maps and figures for applications and hearings: setbacks, haul routes, viewsheds, and noise contours.
04Agency and public process
We prepare for pre-application meetings and hearings, and we answer technical questions.
05Tracking
We track conditions and deadlines through approval.
Sample permit-path summary (illustrative)
| Approval | Agency | Realistic time |
|---|---|---|
| Rezoning / special use | County | 6–12 months |
| State mining permit | State mining program | 3–6 months after complete |
| Discharge permit | State water program | 3–9 months |
| Section 404 (if wetlands) | US Army Corps | 6–18 months |
Illustrative values only. They do not describe any client or site.
What we look for first
Constraints decide the site
A good rock body is only the start. Homes, schools, wetlands, floodplain, endangered species habitat, and road access shrink the area that can be permitted. We map every constraint before anyone spends money on drilling or options.
The order of permits
Permits depend on each other. Some agencies will not accept an application until another approval exists. A permit-path plan puts each approval in the right order and shows the realistic schedule, including hearings.
Exhibits that answer questions
Hearings turn on noise, vibration, dust, truck traffic, and groundwater. Clear maps and figures that answer those questions directly do more than long reports.
Records you can reuse
Every map is delivered in standard GIS formats and Google Earth KMZ, so your team and your consultants can use the same data.
Typical situations
Composite examples that show the kind of problem we solve. They do not describe a specific client.
A rezoning that failed twice
A project had been withdrawn twice after hearings. We remapped the site with larger buffers, a haul route that avoided a school, and noise and vibration exhibits. The smaller footprint kept most of the reserve and gave the board specific answers.
Finding the next quarry
An operator needed a new site within a set haul distance of a growing market. We screened every parcel by geology, ownership, zoning, wetlands, and access, and handed over a ranked shortlist with the reasons for each rank.
A landowner's first question
A landowner wanted to know whether a quarry could ever be permitted on the family land before talking to operators. A constraint map and permit-path plan answered that in a few weeks.
How we price it
Constraint maps and permit-path plans are fixed fees. Hearing support is scoped by the number of hearings.
Questions we get
Which states do you cover?
We work across the US and have published permit guides for several states. Ask about yours.
Can you help at a public hearing?
Yes. We prepare the technical exhibits and answer engineering questions on noise, vibration, dust, traffic, and groundwater.
Do you search for new quarry sites?
Yes. We run regional screens that rank parcels by geology, market, and permit risk.
What GIS deliverables do you provide?
Maps, KMZ files for Google Earth, shapefiles or geodatabases, and print exhibits.
Free tools for this work
State permit guides · Free 1-page site screen · How to screen a quarry site
Start with one question
Send a short description of the site, the deal, or the problem. You get a reply within one business day and a fixed scope-and-fee letter within three.
SEND AN INQUIRY