HOME / SERVICES / SR-01
SR-01

Mining & Quarry Technical Due Diligence

You are about to sign for a mine based on the seller's story. Our job is to find out where the story and the rock disagree — before your money moves. Independent, senior-level, and on your side of the table only.

What this covers

Reserve verification

Drill data, geologic model, and reserve statement checked against the actual core, sections, and survey — not just re-read from the CIM.

Data-room review

Permits, mineral title, leases, royalties, environmental reports, bond obligations, and the QC database — read line by line for what is missing.

Quality & product review

Gradation history, spec compliance, ASR exposure, and whether the plant can actually make what the pro forma sells.

Operations reality check

Equipment condition and hours, stripping obligations, haul profiles, and the capex the seller forgot to mention.

Entitlement & land

Zoning, setbacks, encroachment, adjacent ownership, and expansion room — mapped, not assumed.

Market & competitive position

Who else serves the market, at what freight advantage, and what happens to price when they react.

Deliverables

When you need this

Before an LOI hardens into a PSA. Before a lender commits. Before an auction deadline forces a blind bid. Typical engagement runs two to six weeks depending on data-room depth. Fixed scope and fee quoted after a confidential call.

Who this is for

Strategic acquirers

Aggregate and cement groups adding quarries, terminals, or reserves who need an independent technical view on a tight timeline.

Private equity and lenders

Funds and banks that need reserves, permits, and capex checked before they commit capital.

Sellers

Owners who want to find and fix problems before a buyer's team does, and defend their price.

How an engagement runs

01Data room triage

Within days we index the data room, list what is missing, and send a prioritized request list. Most deals lose time to documents nobody asked for early.

02Site visit

We walk the pit, plant, and property lines. We check highwalls, benches, stockpiles, haul roads, scales, and the condition of the fleet and plant.

03Reserve and permit check

We test the reserve statement against the drilling, check setbacks and permit boundaries, and confirm what rock is actually permitted to mine.

04Risk and value bridge

Each finding gets a cost or a value effect: capex the seller deferred, reserves that will not convert, permits that will not transfer cleanly.

05Report and call

A red-flag memo first, then the full report. We walk the deal team through it and stay available through signing.

Sample red-flag table (illustrative)

AreaFindingEffect
Reserves40% of stated reserve sits inside a 300-ft setback that the county added in 2019Reserve life falls from 52 to 31 years
PermitsDischarge permit caps pumping; pit floor cannot go below current benchNo access to the lower 60 ft of rock
PlantPrimary crusher main frame cracked and welded twiceReplacement capex in year 1
SafetyThree 104(d) orders in 24 months, all on guardingManagement and culture risk

Illustrative values only. They do not describe any client or site.

What we look for first

Reserves that will not convert

Sellers often quote a resource number as if it were a reserve. We take the stated tons and subtract what sits under setbacks, haul roads, plant sites, wetlands, and property-line buffers, then apply realistic recovery. The difference between the brochure number and the mineable number is often the single largest value adjustment in an aggregate deal, and it is easy to verify with the seller's own maps.

Deferred capital

A quarry can show strong margins for years by not spending on the primary crusher, the screen decks, or the haul fleet. We read maintenance logs, rebuild records, and equipment hours, then estimate the catch-up capital the buyer will inherit. We price it in the first three years of the model, because that is when it lands.

Permit transfer and expansion

Some state mining permits, discharge permits, and local zoning conditions do not transfer automatically, and some cap depth, hours, or annual tons. We list every approval, its transfer requirement, and the conditions that limit growth, so the deal team knows which approvals the closing depends on and which expansions the price assumes.

Market position

Price is set by the haul-shed. We map competing quarries and delivered cost to the main customers, then test whether the seller's price history holds up if a competitor opens or a large customer leaves.

Technical due diligence checklist for a mine or quarry acquisition

Every deal is different, but a technical due diligence review of a mine or quarry should answer the same core questions before the purchase agreement is signed. This is the checklist we work from on buy-side mining due diligence. It is also a useful self-check for sellers who want to find the problems before a buyer does.

1. Geology and reserves

Is there a current reserve statement, who signed it, and what drilling supports it? We check drill spacing, core logs, lab data, the geological model, and the cutoff or quality limits used. For aggregates we test the stated tons against setbacks, buffers, wetlands, and the permitted pit outline, then apply realistic mining recovery.

2. Mine plan and life of mine

Does the pit or underground plan actually reach the reserve, at the stated stripping ratio, with workable ramps and benches? We rebuild the life-of-mine schedule from the seller's own surfaces and compare it to the production the model assumes.

3. Permits, zoning, and land

Which permits exist, who holds them, do they transfer on a change of control, and what do they limit (tonnage, hours, depth, blasting, water discharge)? We match the permit boundary to the deed, lease, and mineral-rights records, and flag any reserve that sits outside it.

4. Plant, equipment, and deferred capital

What is the true condition of the crushing and screening plant, the mobile fleet, and the scales? Maintenance logs, rebuild records, and a site walk usually show capital that the seller deferred to protect margins.

5. Product quality and specifications

Do the products meet the DOT and ASTM specifications that the sales forecast depends on? We review gradation records, aggregate source approvals, soundness and abrasion results, and alkali-silica reactivity data.

6. Safety and compliance history

We pull the MSHA violation and accident history, look for patterns such as repeat guarding or ground-control citations, and check the environmental compliance file for open notices.

7. Market, pricing, and haul radius

Who are the competing sources within economic haul distance, what are realistic delivered prices, and is demand growing in that radius? Aggregates are a local business, so this step often decides the value.

8. Costs, closure, and the value bridge

We reconcile unit costs to the financials, estimate reclamation and closure liability, and turn each technical finding into a dollar adjustment, so the deal team can carry it straight into price, escrow, or reps and warranties.

Reporting standards we work to

Public-company buyers and lenders often need reserve work that follows a recognized code. Our reviews can be framed against SEC Regulation S-K subpart 1300 for US filers, Canadian NI 43-101, the JORC Code, and the CIM Definition Standards. For private aggregate deals, the same discipline applies even when no code is required: every ton in the reserve has to be supported by data, a mine plan, and a permit.

How we price it

Most engagements are fixed-fee after a short scoping call. The fee depends on the number of sites, the state of the data room, and the deadline. A desk-top red-flag review of one quarry is the smallest scope; a multi-site portfolio with site visits is the largest.

Questions we get

How fast can you turn a red-flag review?

A one-site desk-top red-flag memo usually takes one to two weeks from data room access. A full report with a site visit takes longer, and we agree the date in the scope letter.

Do you sign NDAs and work anonymously?

Yes. We sign the deal NDA, work inside your data room, and keep the target and your identity confidential.

Can you review a site outside the United States?

Yes. The technical method is the same anywhere. Permit and market work is local, so we tell you up front where we will rely on in-country specialists.

What do you need from us to start?

Data room access, the deal timeline, and the questions that matter most to your investment committee.

Free tools for this work

Free due-diligence checklist (Excel) · MSHA Mine Check · How to value a quarry

Start with one question

Send a short description of the site, the deal, or the problem. You get a reply within one business day and a fixed scope-and-fee letter within three.

SEND AN INQUIRY

Related services

Reserve & Resource Estimation → Pit Optimization & Mine Economics → GIS, Land & Permitting →