HOME / SERVICES / SR-07
SR-07

Pit Optimization & Mine Economics

Every mine has one honest question: where does this operation make the most money, and what does it cost to get there? We answer it with a model you can run yourself — inputs in blue, assumptions on the page, nothing buried.

What this covers

Cutoff & product mix

Break-even and optimum cutoff analysis; product-mix economics when the same face can feed three different spec sheets.

Life-of-mine scheduling

Sequencing that maximizes discounted value instead of just emptying the permit.

NPV & cash-flow modeling

Full DCF models with sensitivity and scenario tables — price, cost, grade, and timing stress-tested before the board sees a single number.

Stripping & haul optimization

Waste timing, dump placement, and haul-profile economics; the cheapest ton is the one you never rehandle.

Fleet & equipment economics

Own-versus-contract analysis, fleet sizing, and replacement timing tied to the actual plan, not the dealer's brochure.

Deliverables

When you need this

Before a capital commitment, during budget season, in a downturn when the plan needs to flex, or when a buyer wants to see the value story with the assumptions visible.

Who this is for

Operators

Sites deciding on a pushback, a new plant, or a product mix.

Buyers and sellers

Deal teams that need a life-of-mine model behind the price.

Landowners

Owners comparing a royalty lease with a sale or a joint venture.

How an engagement runs

01Inputs

We gather reserves, mine plan, costs, prices, capex, taxes, and royalties.

02Model

We build a transparent life-of-mine cash-flow model in Excel. Every input is visible and sourced.

03Cutoffs and limits

We test cutoff grade, break-even stripping ratio, and pit limits against the economics.

04Scenarios

We run price, cost, volume, and permit-delay scenarios and show which ones move value most.

05Decision memo

A short memo with the answer, the drivers, and the risks.

Sample sensitivity (illustrative)

ChangeNPV effectRank
Price −10%−$14.2 M1
Permit delay 2 years−$9.8 M2
Haul cost +20%−$5.1 M3
Capex +15%−$3.6 M4

Illustrative values only. They do not describe any client or site.

What we look for first

Taxes in the right order

After-tax cash flow is where many models go wrong. Depreciation and depletion reduce taxable income but are not cash. We deduct them before tax and add them back after, and we show the tax shield as its own line so a reviewer can follow it.

Limits from the economics

Cutoff grade, break-even stripping ratio, and pit limits come from the economics, not the other way around. We tie each one to price, cost, and royalty so a change in one input flows through to the reserve.

Scenarios that matter

We rank scenarios by how much they move value. In aggregates, price, haul distance, and permit timing usually dominate; capex matters less than most people expect.

Royalties and leases

For landowners and operators, we model royalty structures — percentage of price, cents per ton with escalators, and minimum annual royalties — and show what each is worth over time.

Typical situations

Composite examples that show the kind of problem we solve. They do not describe a specific client.

Pushback or not

An operator debated a large pushback. The model showed that the block stripping ratio sat above the break-even ratio at current prices, but below it with a modest price increase. The decision became a timing question, not a yes or no.

Sale or lease

A landowner compared a cash offer with a royalty lease. We modeled the royalty stream under the operator's likely mine plan and showed the present value of each, with the risks of each.

A deal model that hid the tax

A deal model added depreciation back without deducting it first. Correcting the tax sequence changed after-tax cash flow in every year and the value of the deal.

How we price it

Models are fixed-fee by complexity. A screening model for one site is the smallest scope.

Questions we get

Do you deliver the model?

Yes. You get the working Excel model, not just a PDF.

How do you handle taxes and depreciation?

We model taxes on taxable income after depreciation, depletion where it applies, and royalties, then build after-tax cash flow. We document every assumption.

Can you value a royalty or a lease?

Yes. We model the royalty stream from the mine plan and price outlook and compare it with a sale or other structures.

Do you use a fixed discount rate?

We show the result at several discount rates and explain which one fits the risk.

Free tools for this work

Quarry NPV and BESR calculators · Crushed stone price trend · Greenfield economics how-to

Start with one question

Send a short description of the site, the deal, or the problem. You get a reply within one business day and a fixed scope-and-fee letter within three.