HOME / SERVICES / SR-03
SR-03

Mine Planning & Engineering

Good mine plans make money quietly. Bad ones bleed it into stripping, rehandle, and downtime nobody budgeted. We review, fix, and build plans that the pit crew can actually run.

What this covers

Pit & phase design review

Bench geometry, wall angles, ramp systems, and phasing checked against the reserve, the equipment, and the ground.

Stripping & scheduling

Waste scheduling that smooths the strip ratio instead of letting it ambush year three.

Drill & blast optimization

Pattern design, powder factor, timing, and fragmentation review — better breakage upstream is the cheapest crusher upgrade there is.

Ground control

Slope and bench stability review, catch-bench adequacy, and monitoring recommendations for surface operations.

Ventilation

Airflow, resistance, and fan-duty analysis for underground workings under applicable MSHA parts.

Deliverables

When you need this

When costs drift and nobody can point to why. Before committing to a pushback. When the insurance carrier or regulator asks questions the current plan can't answer.

Who this is for

Quarry operators

Sites that need a pit phasing plan, a ramp redesign, a blast pattern review, or a fleet study.

Buyers

Acquirers who need to know whether the mine plan behind the price actually works.

Underground operations

Mines that need ventilation, ground control, or development-plan reviews.

How an engagement runs

01Problem definition

We agree on the one question the study must answer and the decision it supports.

02Site data

We collect surveys, drone topography, blast records, fleet data, and production reports.

03Design and analysis

We design or review the pit, ramps, blast patterns, haul routes, fleet, and ventilation as the scope requires.

04Options and cost

We compare two or three options on cost per ton, safety, and risk.

05Handover

Drawings, models, and a short plan the site team can run without us.

Sample fleet study result (illustrative)

CaseTrucksCost per ton
Current fleet, current ramp9$1.42
Current fleet, new 8% ramp8$1.27
Larger loader, new ramp7$1.18
Conveyor from pit floor3$0.96 after capex

Illustrative values only. They do not describe any client or site.

What we look for first

Cost per ton is the score

Every design choice is tested on cost per ton and safety. A steeper ramp, a different bench height, or a new loader each change the fleet, the fuel, and the tire bill. We model the whole haul cycle so the comparison is fair.

Blast design that fits the plant

Fragmentation drives loading, hauling, and crusher throughput. We review burden, spacing, stemming, subdrill, and timing against the rock and the primary crusher gap, and we balance them against vibration limits at the nearest structure.

Phasing and reserves together

A pit plan that mines the easy rock first can strand reserves later. We phase pushbacks so stripping stays smooth and the plant gets consistent feed for the life of the mine.

Ventilation and ground control

For underground work, we review airflow, fan duty, and pillar and roof-support design against the standards the mine operates under.

Typical situations

Composite examples that show the kind of problem we solve. They do not describe a specific client.

A ramp that cost a truck

A quarry had added a truck every few years as the pit deepened. A ramp redesign at a steadier grade, with a shorter route to the primary crusher, removed one truck from the cycle and cut fuel per ton.

Blasting complaints

A site near new homes faced vibration complaints. We reviewed the seismograph records and the pattern, reduced the charge per delay with more delays and smaller holes near the property line, and set a monitoring plan the site could defend at the next public meeting.

Oversize at the primary

Oversize was stalling the primary crusher. We matched burden, spacing, and stemming to the rock and the crusher gap. Secondary breaking fell and the plant ran closer to its rated feed.

How we price it

Studies are fixed-fee by scope. Design reviews are the smallest scope; a life-of-mine plan with phasing and fleet is the largest.

Questions we get

Do you only work on quarries?

No. Most of our work is aggregates and industrial minerals, but we also review metal mine plans, underground ventilation, and ground control.

Can you help after a blasting complaint?

Yes. We review the blast design and seismograph records, and we write a monitoring and pattern plan that reduces vibration and flyrock risk.

Will you work with our blasting contractor?

Yes. The best results come when the contractor, the site, and the engineer review the pattern together.

Do you provide stamped drawings?

Ask us about the state and the deliverable. Licensing is state-specific.

Free tools for this work

Engineering calculators · How to design a pit ramp · How to design a blast pattern

Start with one question

Send a short description of the site, the deal, or the problem. You get a reply within one business day and a fixed scope-and-fee letter within three.

SEND AN INQUIRY

Related services

Pit Optimization & Mine Economics → Reserve & Resource Estimation → Processing & Quality Control →