Processing & Quality Control
Off-spec product is money on the ground. We find where the plant, the pit, or the paperwork is producing it — with mass balances and lab data, not opinions.
What this covers
Plant mass balance
Full-circuit balances that show exactly where every ton and every fine goes — and where the spec is being made or lost.
Gradation & spec compliance
Product analysis against ASTM, state DOT, and customer specifications, with root-cause identification when a product drifts.
ASR evaluation programs
Alkali-silica reactivity testing strategy and interpretation under ASTM C1260, C1293, and C1567 — including reconciling contradictory historical results.
Crushing & screening optimization
Crusher settings, screen selections, and circuit changes evaluated by their effect on yield, spec, and cost per ton.
QC data analysis
Your existing QC database mined for trends, drift, and the early warnings the monthly report keeps missing.
Deliverables
- Mass-balance workbook with live formulas
- Spec-compliance report with root cause and fix
- ASR testing program and interpretation memo
- Plant change recommendations ranked by payback
When you need this
A product keeps failing a sieve. A big spec customer is asking hard questions. A new deposit needs its quality story proven before the money is spent.
Who this is for
Plant managers
Plants with a product out of spec, a bottleneck, or too much of a low-value product.
Quality teams
Labs that need a QC program, sampling plan, or control charts that DOT auditors accept.
Buyers
Deal teams that need to know what the plant can really produce.
How an engagement runs
01Plant walk and data
We walk the flowsheet and pull production, scale, and gradation data.
02Mass balance
We close the balance around crushers, screens, and stockpiles. Most plant problems show up as a balance that does not close.
03Quality review
We test sampling practice, lab methods, and gradation trends against the specifications.
04Fixes
We rank changes by payback: screen media, closed-side settings, bypass routing, wash water, or a new circuit.
05Control plan
We leave a QC plan, control charts, and a short training session for the crew.
Sample mass balance finding (illustrative)
| Stream | Design | Measured |
|---|---|---|
| Primary feed | 600 tph | 600 tph |
| Scalper bypass | 90 tph | 185 tph |
| #57 stone | 210 tph | 148 tph |
| Screenings | 120 tph | 196 tph |
Illustrative values only. They do not describe any client or site.
What we look for first
Close the balance first
When a plant makes too much of one product and not enough of another, the cause is usually visible in a mass balance: a worn screen, a bypass that runs too hot, or a crusher setting that drifted. We measure before we recommend.
Sampling decides quality
Many out-of-spec results come from sampling, not production. We check where and how samples are taken, how they are split, and how the lab tests them, because a bad sample can fail good rock or pass bad rock.
Product mix and margin
Not every ton earns the same margin. We look at which products sell, which pile up, and which plant changes shift the mix toward higher-value stone.
Beyond aggregates
For industrial and metal operations, we review concentrator circuits, recovery, and metal accounting with the same mass-balance discipline.
Typical situations
Composite examples that show the kind of problem we solve. They do not describe a specific client.
Too many screenings
A plant sold out of clean stone but piled up screenings. The mass balance showed a scalper bypass running at twice its design rate. Changing the media and the bypass split moved tons back to the saleable products.
A failed DOT audit
A quarry failed a DOT gradation audit on rock that tested fine in its own lab. The cause was sampling from the edge of the stockpile. A new sampling plan and control charts cleared the next audit.
Can this plant make concrete sand?
A buyer wanted to add manufactured sand. We reviewed the rock, the existing circuit, and water supply, and laid out the equipment and wash-water plan the product would need.
How we price it
A plant audit is a fixed fee. Larger flowsheet redesigns are scoped after the audit.
Questions we get
Can you fix a gradation problem without new equipment?
Often yes. Screen media, crusher settings, and feed control fix many gradation problems for a small fraction of the cost of new equipment.
Do you work with DOT quality programs?
Yes. We set up sampling, testing, and control-chart programs that match state DOT quality requirements.
Can you assess ASR risk?
Yes. We review petrography and the accelerated mortar-bar and concrete-prism results and recommend mitigation.
Do you do mineral processing beyond aggregates?
Yes. We review flotation, gravity, and magnetic circuits and metal accounting for industrial and metal mines.
Free tools for this work
How to do a plant mass balance · How to read a gradation curve · Mass Balance Mayhem (game)
Start with one question
Send a short description of the site, the deal, or the problem. You get a reply within one business day and a fixed scope-and-fee letter within three.
SEND AN INQUIRY